Campus roadways will be getting new paint stripes — including all double yellow, cross walks, stop lettering, and parallel parking — from April 21 to May 12 courtesy of 1-800 STRIPER.

The striping will presumably occur from 7:00 p.m. to 7:00 a.m, though the Facilities Department notification email erroneously listed the times as as 7:00 p.m. to 7:00 p.m. Facilities has not yet responded to the Campus Times for clarification.

The striping efforts will be most effective and efficient with as few cars as possible on the road as possible during the striping times.

“Any necessary signage, road protection or re-direction of traffic will be handled by 1-800 STRIPER,” said the email.



Campus roadways getting a fresh coat of paint

Through a live demonstration and tasting, Chef Dede prepared fried chicken, baked macaroni and cheese, and collard greens – dishes rooted in Black Southern history. Students leaned in as she explained the methods and care that go into each plate. Read More

Campus roadways getting a fresh coat of paint

However, recent student protests are considerably less effective than they used to be. According to The American Prospect, there were far fewer young attendees to the most recent round of No Kings marches in proportion to the attendance of older generations. Read More

Campus roadways getting a fresh coat of paint

So, you have a degree in Biochemistry and English. You served in student government for four years, clustered in Astrophysics, and speak passable German. In other words, you’re unemployed.  Read More