Hutchison Hall experienced a minor leak in their water line during the week of Sept. 29. The water line feeds directly into the fire protection system, meaning Hutchison Hall – the hotspot for labs and other fire hazardous activities – was left without water sprinklers.

According to the URochester Chemistry Department, this water main leak was estimated to be fixed within two weeks. In the meantime, a security guard was tasked with providing fire watch between the hours of 6 p.m. to 6 a.m. 

No major incidents took place inside of Hutchison Hall while the fire protection system was down. Experiments and labs continued as usual, and no use was made of the precautionary measures. As predicted, the main took the better part of two weeks to repair and is now in functional condition once again. 



Politics in the post-Trump Era

Trump has been in American politics for over a decade now, and is halfway through his final term. Read More

Pride night on Friday the 13th

Into the night's events, the ’Jackets women took the win in most events, and placed 1–4 in the 200 yard Medley Relay, with senior Sophia Dmytruk, first-year Rebekah Jung, and sophomores Ally Mackey, Julianne Weaver taking the win with a time of 1:54.53. Junior Amelia Hardiman won the 1000-Yard Freestyle with a mark of 11:15.28, the only one in her race to finish sub-12 minutes. Read More

Men’s Basketball pulls away from Vassar in a tournament victory

The ’Jackets regained control after halftime, limiting the Brewers to just 9-for-34 attempts from the field in the second half. The Brewers also committed six turnovers during the period, struggling to find offensive consistency as the ’Jackets maintained their advantage.  Read More